PAT Testing Northampton
  • PAT Testing
    • Landlords & Rentals
    • Industrial Estates
    • Offices
    • Service Area >
      • Daventry
      • Wellingborough
      • East Northamptonshire
      • Kettering
      • Corby
      • South Northamptonshire
      • Weston Favell
      • Brackmills
      • Moulton Park
      • Round Spinney
  • EICR
    • Domestic EICR >
      • EICR Daventry
      • EICR Wellingborough
      • EICR Corby
    • Industrial EICR >
      • EICR Brackmills & Moulton
      • Wellingborough
  • Prices
  • FAQ
    • Terms & Conditions 2026
  • Contact Us
  1. PAT Testing Northampton
  2. Industrial EICR Northamptonshire
  3. Wellingborough

Park Farm · Denington · Finedon Road

Industrial EICR & fixed wire testing in Wellingborough

Arrange inspection and testing of the fixed electrical installation at your Wellingborough factory, warehouse or workshop with PAT Testing Northampton.

An Electrical Installation Condition Report records the condition of the installation within an agreed scope. We start with your premises, available records and operating hours, so the inspection and any necessary power interruptions can be planned together.

Get an industrial EICR quoteCall 01604 312137

For site managers, business owners, industrial landlords and managing agents.

Outgoing circuit wiring and protective devices inside a board.
Outgoing circuit wiring and protective devices inside a board.
Scope agreed for your unit
Identify the boards, circuits and areas to include.
Power interruptions planned
Discuss isolation, access and equipment restart.
Findings recorded clearly
A written report with relevant inspection and test schedules.
  • Wellingborough coverage
  • Inspection scope
  • Planning the visit
  • Unit & records
  • Costs
  • Photographs
  • FAQs

Industrial premises across the town

Industrial EICR coverage in Wellingborough

We take enquiries for industrial premises on Park Farm, Denington and Finedon Road Industrial Estates, as well as other Wellingborough business locations. Give us the full unit address and postcode so we can establish the right scope and access arrangements.

  • Park Farm Industrial Estate
  • Denington Industrial Estate
  • Finedon Road Industrial Estate

Park Farm

For premises around Fleming Close and the wider Park Farm estate, include both the unit number and the entrance to use. If the inspection needs to cover a warehouse and adjoining offices, identify both in the enquiry and provide their board schedules where available.

Denington

For a workshop or leased industrial unit on Denington, explain whether the electrical supply serves only your premises. If a landlord or another occupier controls an incoming board or shared area, arrange their involvement before the visit.

Finedon Road

For premises on the Finedon Road estate, including Bevan Close, describe the work taking place in the building. Flag production equipment, extraction, refrigeration or other supplies that need a managed shutdown, if present.

The address is the starting point. The installation sets the plan.

Two neighbouring units can need very different inspections. One may have a single board and a clear circuit schedule; another may have several boards, added equipment and supplies extending into adjoining space.

Send the latest EICR and tell us what has changed since it was issued. For other sites in the county, see our industrial EICR Northamptonshire service. If you also need equipment testing, use our PAT testing in Wellingborough page.

Production line, access aisle and overhead lighting.
Production line, access aisle and overhead lighting.

What the assessment covers

Fixed wire testing for factories, warehouses and workshops

An industrial EICR combines inspection with appropriate testing of the permanent electrical installation. Before work starts, agree the extent of the assessment and record any access restrictions or other limitations.

Distribution boards and circuit identification

Assess the relevant boards, protective devices and circuit information. Clear identification helps connect the report to the installation and makes future maintenance easier to plan.

Distribution board with marked three-phase circuit positions.
Distribution board with marked three-phase circuit positions.

Fixed wiring, earthing and protection

Inspect accessible wiring and protective arrangements, with appropriate continuity, insulation resistance, polarity and other installation tests. The tests and methods depend on the equipment and agreed scope.

Circuit breakers, wiring and protective conductors in an open board.
Circuit breakers, wiring and protective conductors in an open board.

Fixed supplies and local isolation

Include the agreed circuits supplying plant and local isolation points. Establish where the fixed installation assessment ends and any separate assessment of machinery or controls begins.

Wall-mounted switches, fuse enclosure and control switch.
Wall-mounted switches, fuse enclosure and control switch.

Lighting, sockets and ancillary areas

Identify the power and lighting circuits serving the working areas, offices and other spaces included in the inspection. Appropriate loop impedance, RCD and functional checks support the assessment.

Board identification for office power, lighting and other circuits.
Board identification for office power, lighting and other circuits.
Tell us about unusual supplies before booking. Three-phase distribution, solar generation, batteries, generators or UPS systems can affect the inspection plan. High-voltage equipment, hazardous areas and specialist machine-safety work need their own agreed requirements; they are not automatically included in a general EICR.

Keep the visit connected to your operation

Agree the power-off window before the inspection

Parts of the inspection and testing require safe isolation. Tell us what can stop, what needs a controlled shutdown and who will authorise the interruption. A phased visit may be possible where the installation and access allow it.

Plan your inspection visit

Preparing an occupied industrial site

Plan access, isolation and return to service

For an occupied Wellingborough unit, the useful question is which circuits can be interrupted and when. A preferred appointment date alone does not establish that the site will be ready for testing.

1. Share the installation information

Send the previous report, available board schedules and a description of any additions. Identify the areas that must be covered and the person who can explain the installation on site.

2. Agree the interruption plan

List sensitive or essential supplies and the windows available for isolation. Confirm access to each board, any induction requirements and who will handle equipment shutdown.

3. Arrange the handover

Have an authorised site contact available. Agree who will restart equipment, check normal operation and receive any immediate findings before the inspection team leaves.

Information to include when these systems are present
Part of the siteWhat to explain before the visit
Warehouse and dispatchOperating hours, goods-in access, powered doors, picking systems and charging areas. Identify supplies that must be available for planned dispatch activity.
Production and workshopProcess shutdown times, extraction and equipment controls. Confirm whether your maintenance team or a machine specialist needs to attend for shutdown and restart.
Offices, IT and securityServers, communications, access control and any backup supplies. Identify the person responsible for managing a planned interruption to those systems.
Shared or landlord-controlled areasOther occupiers affected, access to incoming equipment and who can authorise work. A switch inside one unit may serve equipment beyond that unit.

Discuss early starts, evenings or weekends if they would help. Attendance, phasing and any additional cost need confirmation with the quotation.

Leased units, alterations and incomplete records

Make sure the report covers the premises you use today

A previous EICR can be useful, but its scope may describe a different arrangement. This matters when a business takes over a unit, adds a mezzanine, changes equipment or occupies part of a larger building.

  • Check the boundaries: unit, yard, offices and any common areas required in the assessment.
  • Identify changes: added circuits, altered layouts or new electrical loads since the last report.
  • Bring the right records: previous EICRs, installation certificates and current circuit schedules where available.
  • Explain the requirement: share the wording of a lease, insurer or managing-agent request for an electrical report.

If the records are missing, say so at the quotation stage. Identification work and access arrangements may affect the time required. Photographs of closed boards and their labels can help; do not remove electrical covers to take them.

Separate circuit schedules for mechanical services, power and lighting.
Separate circuit schedules for mechanical services, power and lighting.
Condition reporting and new installation work serve different purposes. An EICR assesses the condition of the agreed installation. It does not replace the design, installation and verification needed when new circuits or equipment supplies are added.

A quotation for the actual work

Industrial EICR costs in Wellingborough

Price depends on the installation, the available information and how the inspection can be carried out. A small workshop with several undocumented circuits can need more preparation than its floor area suggests.

  • Number of distribution boards and circuits to assess.
  • Installation complexity and the quality of existing records.
  • Access restrictions and the power-off windows available.
  • Any phased visits, out-of-hours work or extra circuit identification.

Send the unit address, premises type, previous report and preferred dates for a quotation. Confirm the included scope, VAT position, report issue arrangements and exclusions. Repairs and additional investigation are separate unless expressly included.

Request your Wellingborough quote
Factory work area with process equipment and materials.
Factory work area with process equipment and materials.

Turn the findings into a maintenance plan

Your report, follow-up work and next inspection

Read the assessment with its limitations

The overall result should be read alongside the observations, test schedules and agreed extent. Immediate danger requires immediate action; potentially dangerous defects require urgent remedial action. Discuss the recorded findings and priorities with the inspector.

Keep subsequent investigation and repair records with the report. Our industrial EICR report guidance explains the assessment and observation codes in more detail.

Use an interval suited to the installation

Industrial EICRs do not have one universal statutory five-year interval. The competent inspector considers use, maintenance, environment and the installation itself when recommending the next inspection.

Check the previous recommendation alongside relevant lease or insurer conditions. Changes to the installation or signs of deterioration may call for attention before the routine inspection date.

Existing circuit details schedule attached inside a board door.
Existing circuit details schedule attached inside a board door.
Existing circuit details and test information on a board schedule.
Existing circuit details and test information on a board schedule.

Industrial installation photographs

A closer look at boards, circuits and industrial work areas

These photographs illustrate the electrical equipment, installation records and working environments relevant to an industrial inspection. Select a photograph to see the full image.

Closed metal electrical distribution cabinet.
Closed metal electrical distribution cabinet.
Multiple rows of protective devices within an electrical cabinet.
Multiple rows of protective devices within an electrical cabinet.
Open distribution board showing conductors and protective devices.
Open distribution board showing conductors and protective devices.
Process machinery and its local control panels.
Process machinery and its local control panels.
Distribution board enclosure labelled DB3.
Distribution board enclosure labelled DB3.
Workshop area with equipment and materials awaiting use.
Workshop area with equipment and materials awaiting use.
View 6 more installation photographs
Electrical cabinet with switching equipment mounted alongside.
Electrical cabinet with switching equipment mounted alongside.
Distribution board with labelled circuits and main switching equipment.
Distribution board with labelled circuits and main switching equipment.
Manufacturing equipment and fixed lighting within a production building.
Manufacturing equipment and fixed lighting within a production building.
Close view of protective devices and conductors inside a board.
Close view of protective devices and conductors inside a board.
Numbered circuit breakers with conductors arranged around the board.
Numbered circuit breakers with conductors arranged around the board.
Fluke multifunction tester beside an industrial distribution board.
Fluke multifunction tester beside an industrial distribution board.

Before you book

Industrial EICR Wellingborough FAQs

Yes. We take industrial EICR enquiries for all three estates and other Wellingborough business premises. Send the full unit address and postcode, a description of the installation and your preferred dates. Access, inspection scope and availability are confirmed when arranging the work.

Fixed wire testing describes inspection and testing of the permanent electrical installation. The EICR is the written report of its condition. If someone has asked for an electrical safety certificate, share their exact request so we can establish the document and scope they need.

Some activities may be able to continue, but parts of the inspection require circuits to be safely isolated. Explain which supplies support day-to-day operation and which cannot be interrupted without preparation. Continued occupation, phased testing and access arrangements depend on the installation and an agreed plan.

Tell us the hours that would suit the site, including any proposed early start, evening or weekend. The attendance window, staffing, access and price need to be agreed before booking. We also need to know who will shut down and restart any affected equipment.

Start with the previous EICR if available, the unit address, premises use and photographs of closed boards and visible labels. Explain any additions or areas supplied from another unit. Missing or inaccurate circuit records may require extra identification work; do not open electrical enclosures to take photographs.

The agreed scope can include three-phase distribution and fixed circuits supplying equipment. It does not automatically include every internal machine component, control or safety system. Describe the plant and any separate machinery-assessment requirement when requesting the quotation.

Identify the person who controls access to incoming equipment and any shared boards, as well as the authorised contact for your unit. Send the relevant lease or managing-agent request and agree the areas to be inspected. Responsibilities and access arrangements depend on the actual tenancy and installation.

There is no universal statutory five-year interval for all industrial installations. The competent inspector recommends an interval based on the installation, operation, maintenance and environment. Check the previous report and relevant lease or insurer conditions, and flag significant alterations or deterioration.

Time depends on the boards and circuits included, their accessibility, the available records and the agreed isolation windows. Confirm the expected attendance and report issue arrangements in the quotation, especially if an insurer, landlord or audit deadline is involved. Repairs or extra investigation need separate agreement unless included.

Tell us about both requirements when enquiring so the work can be scoped separately. The EICR covers the agreed fixed installation; PAT concerns appliances and electrical equipment. See our PAT testing in Wellingborough service for equipment checks.

The inspection and its documentation

What you receive with your industrial EICR

A written condition report

The assessment of the agreed installation, relevant inspection and test schedules, and recorded limitations.

Clear findings and priorities

Recorded observations to help you understand the condition of the installation and the urgency of any action.

Information for the next step

A basis for discussing remedial work, investigation and ongoing maintenance. Any additional work needs a separate agreed scope.

Arrange inspection and testing

Get your Wellingborough industrial EICR quote

Tell us where the premises are, what the building is used for and when power interruptions can be accommodated. Include available circuit details, the previous report and any deadline so we can discuss the work required.

Send your industrial EICR enquiryCall 01604 312137

For appliance testing, see PAT testing in Wellingborough or industrial PAT testing. For a home or rental property, visit our domestic EICR service.

Other industrial locations: Brackmills and Moulton Park. Further reading: HSE guidance on the Electricity at Work Regulations and IET inspection and testing FAQs.

Industrial installation photograph

PAT Testing Daventry Google Reviews
PAT Testing Daventry Facebook Reviews
PAT Testing Daventry Trustpilot Reviews
PAT Testing Daventry Yell Reviews

Contact Us »
PAT Testing Northampton

📞 01604 312137
​

PRICES »​
CONTACT »
​Landlords »
Office »
​Industrial Estates »

Opening Hours

Mon: 8:00 am –  6:00 pm
  Tue: 8:00 am –  6:00 pm
Wed: 8:00 am –  6:00 pm
Thu: 8:00 am  –  6:00 pm
  Fri: 8:00 am  –  6:00 pm
 Sat: 8:00 am  –  6:00 pm
Sun: 8:00 am  –  6:00 pm
​
📞 ​01604 312137
​

PAT Testing in Northampton 2026
PAT Testing Northampton 2026

Service Area
PAT Testing Milton Keynes​
​​Corby | ​Daventry | ​Brackmills | Round Spinney | Moulton Park | Kettering | ​​Weston Favell​​ | Wellingborough | ​South Northamptonshire | ​East Northamptonshire​
​
Terms & Conditions 2026
© COPYRIGHT 2026 (ALL RIGHTS RESERVED)
​

  • PAT Testing
    • Landlords & Rentals
    • Industrial Estates
    • Offices
    • Service Area >
      • Daventry
      • Wellingborough
      • East Northamptonshire
      • Kettering
      • Corby
      • South Northamptonshire
      • Weston Favell
      • Brackmills
      • Moulton Park
      • Round Spinney
  • EICR
    • Domestic EICR >
      • EICR Daventry
      • EICR Wellingborough
      • EICR Corby
    • Industrial EICR >
      • EICR Brackmills & Moulton
      • Wellingborough
  • Prices
  • FAQ
    • Terms & Conditions 2026
  • Contact Us