Factories · Warehouses · Workshops
Industrial EICR & Fixed Wire Testing in Northamptonshire
Arrange inspection and testing of your industrial premises’ fixed electrical installation with PAT Testing Northampton. An Electrical Installation Condition Report records the condition of the installation, the findings and the action needed within an agreed scope.
Tell us about the site, distribution boards and operational restrictions. We can then discuss the work, access and necessary power interruptions before quoting.
For a home or rental property, visit our domestic EICR Northamptonshire page.

- Define the installation
- Boards, circuits, fixed supplies and any agreed limitations.
- Plan the visit
- Access, isolation windows and the people responsible for the site.
- Record the findings
- A written condition report and priorities for follow-up.
A condition report for your working premises
Industrial electrical inspections shaped around the site
Industrial fixed wire testing assesses the permanent electrical installation supplying the building and its connected loads. It combines inspection with appropriate electrical tests. The resulting EICR helps site managers, occupiers and landlords understand the recorded condition and plan maintenance.
Factories and production sites
Identify production supplies, local isolation points and processes that need an agreed stop and restart.
Warehouses and logistics units
Plan access around storage, loading activity, distribution boards and lighting circuits.
Workshops and engineering units
Describe fixed supplies, three-phase equipment connections and any separate workshop buildings.
Industrial estates and managed units
Confirm the boundary between tenant installations, landlord supplies and shared areas.
One site can contain several installations. Include offices, welfare areas, stores, external circuits and separately supplied buildings in your enquiry. Their inclusion should be agreed in the inspection scope.
What is included in fixed wire testing?
Boards, circuits and protective measures
The agreed extent determines which parts of the installation are inspected and tested. Accessible equipment, circuit information and any restrictions are recorded, so the report is clear about what its assessment covers.
Distribution boards and switchgear
Assessment of accessible enclosures, protective devices, switching equipment and circuit identification. Observations may concern damage, deterioration or the suitability of the protection provided.

Fixed wiring, earthing and bonding
Inspection and appropriate tests of circuits and protective conductors, including relevant continuity, insulation resistance and polarity checks. Sensitive equipment must be considered when planning tests.

Three-phase electrical testing
Three-phase distribution can supply production equipment and multiple outgoing circuits. Tell us about the supply arrangement, board count and connected plant when requesting a quote. The testing scope must reflect the actual installation and the available records.
High-voltage systems, hazardous areas, specialist machinery and alternative energy supplies need to be identified before booking so we can establish the appropriate scope and competence requirements.

How an EICR differs from other electrical checks
| Work | Purpose and boundary |
|---|---|
| Industrial EICR | Assesses the agreed fixed electrical installation and records its condition, observations and test information. |
| PAT testing | Assesses electrical appliances and equipment. See our industrial PAT testing service if you need both. |
| Machinery and work equipment | Machine internals, guarding and safety functions require their own appropriate assessment. Testing a supply circuit does not establish the safety of every machine function. |
| Other specialist checks | Thermal imaging, emergency lighting, fire alarms and remedial work are not automatically included in an EICR. Identify any separate requirements when enquiring. |
Before, during and after the appointment
Planning an industrial EICR visit
Define the work
Share the last report, board schedules and any changes since the previous inspection. Confirm the buildings, circuits, responsibilities and limitations that the quotation needs to cover.
Agree access and isolation
Identify the site contact, authorised shutdown arrangements, inductions and access restrictions. Discuss available maintenance windows and any request for work outside normal operating hours.
Inspect, report and follow up
The findings and test information form the written report. Review its assessment, prioritise any required action and keep subsequent completion records with the original EICR.
Information that makes the visit easier to organise
- The person who can authorise isolation and coordinate plant restart.
- Critical processes, IT, refrigeration, alarms and other sensitive loads.
- Solar PV, batteries, generators, UPS systems or other sources of supply.
- Restricted rooms, working-at-height needs and access to each board.
- Required site inductions, permits and relevant operating procedures.
Phased work or particular appointment times must be agreed for the installation and the available access. Testing cannot be promised without power interruptions.

Inspection frequency and workplace duties
How often does an industrial installation need an EICR?
There is no single statutory five-year interval for every industrial site. The appropriate interval depends on the installation, its use, environmental conditions, maintenance and previous findings.
Start with the last report
Check the recommended next inspection date and the reasons given. Review any outstanding findings, additions or changes in use. Damage, unusual heating or other concerns may need attention before the planned inspection date.
Consider the wider requirements
Check relevant insurance and lease requirements alongside the site’s maintenance arrangements. Conditions such as dust, moisture, mechanical damage and intensive use can affect the inspection and maintenance plan.
The legal duty concerns preventing danger. The Electricity at Work Regulations 1989 place duties on employers and others with control of electrical systems. An EICR helps inform maintenance decisions; ongoing responsibilities extend beyond obtaining the report.
Understand the record and the next steps
Your industrial Electrical Installation Condition Report
Read the overall assessment alongside the extent, limitations, observations and test schedules. Together, these explain what was assessed and the findings that need attention.
What the report records
- The installation covered and any recorded limitations.
- The inspection observations and relevant test results.
- The overall assessment and coded findings.
- The recommended next inspection date and supporting reasons.
What happens after the inspection?
Discuss urgent issues and the necessary follow-up with the inspector. Any remedial work or further investigation needs a clear scope and agreement. Keep evidence of the completed work with the original report.
Agree the reporting timescale before booking. Our terms and conditions explain the report issue and payment arrangements.
- C1
- Danger present. Immediate action is needed to make the situation safe.
- C2
- Potentially dangerous. Urgent remedial action is required.
- C3
- Improvement recommended. This code alone does not make the overall result unsatisfactory.
- FI
- Further investigation. Check the report edition, the inspector’s explanation and the action advised.
C1 or C2 findings make the overall result unsatisfactory. On BS 7671:2018+A4:2026 reports, FI is advisory and does not alone make the result unsatisfactory. Earlier report formats treat FI differently. Follow the stated findings and urgency; do not apply a domestic rental deadline automatically to an industrial site.
A quotation based on the installation
How much does industrial fixed wire testing cost?
The price depends on the installation and the work needed to inspect and test it. Floor area alone does not describe the number of circuits, boards or access arrangements.
- Number and type of distribution boards and circuits.
- Installation size, complexity and available circuit records.
- Access, isolation planning and agreed working hours.
- Additional buildings, supplies and site requirements.
- The agreed inspection extent and reporting requirements.
Send the postcode, a description of the operation and the last EICR if available. Photographs of closed boards and circuit schedules can help us understand the enquiry. Confirm the total price, VAT position and exclusions before booking.

Northamptonshire industrial premises
County-wide enquiries, with local site planning
We take industrial EICR enquiries across Northamptonshire. Send the full site address and postcode so we can discuss the installation, access and appointment availability.
- Northampton
- Brackmills
- Moulton Park
- Round Spinney
- Daventry
- Wellingborough
- Kettering
- Corby
- Rushden
- Towcester
- Brackley
- Raunds
- Desborough
- Rothwell
- Oundle
- Irthlingborough
Northampton and its industrial areas
Include the unit number and access arrangements for sites in Brackmills, Moulton Park and Round Spinney. Identify separately occupied units and shared supplies.
Daventry and western Northamptonshire
For a factory, workshop or warehouse, explain the number of buildings and boards and who controls each supply. Include the operating hours and proposed testing window.
North and east Northamptonshire
For sites around Kettering, Corby, Wellingborough and Rushden, provide each address in a multi-site enquiry and note any different access or production restrictions.
Need appliance testing alongside the fixed installation inspection? See industrial PAT testing, including Brackmills, Moulton Park and Daventry. For residential work, use our Northamptonshire domestic EICR hub or Daventry home and rental EICR page.
Industrial installations in detail
Fixed wire testing and industrial premises gallery
These photographs show the range of boards, circuit records, fixed supplies and working environments involved in planning an industrial inspection. Select a photograph to view it at full size.






View 29 more industrial photographs





























Questions before you book
Industrial EICR questions answered
Fixed wire testing describes inspection and testing of the permanent electrical installation. The EICR is the written condition report produced from that work. People may call it an industrial EICR certificate, but the document records an assessment and findings within its stated scope.
There is no universal statutory five-year EICR period for all industrial premises. The appropriate interval depends on use, condition, maintenance, external influences and previous findings. Check the last report and any relevant lease or insurer requirements when arranging the next inspection.
Some work may be planned around areas that remain in use, but parts of the inspection and testing require isolation. Identify the affected circuits and agree a safe work plan with the site contact. Whether a phased approach is suitable depends on the installation and access.
Yes, include your preferred maintenance window or out-of-hours requirement in the enquiry. Availability, access, site staffing and any pricing implications need agreement before the appointment. Do not assume a particular slot is booked until it has been confirmed.
The agreed fixed installation scope may include circuits supplying machinery. That does not automatically assess all machine internals, guarding or safety functions. Identify separate machinery and work-equipment inspection requirements when discussing the site.
Tell us which records are unavailable and send photographs of closed boards where possible. Missing or inaccurate circuit information can affect identification, planning and the time needed. The quotation should address the intended scope and any additional work required.
Duration depends on circuit and board count, installation complexity, access, records and agreed isolation windows. Send the previous report and site details so the work can be assessed. Confirm both the site attendance plan and report issue arrangements before booking.
Remedial work and extra investigation are agreed separately unless expressly included in the quotation. Ask for the inspection extent, total price, VAT position and exclusions in writing. Required follow-up should reflect the findings and urgency recorded by the inspector.
Ask the insurer or landlord what document, scope and reporting period they require, then share that requirement when enquiring. An EICR provides evidence about the assessed installation, but acceptance and other conditions depend on the particular policy or lease.
The two services address different parts of electrical safety. An EICR assesses the fixed installation; PAT concerns electrical equipment. A satisfactory EICR does not remove the need to assess and maintain appliances appropriately. See our industrial PAT testing page for that service.
From the agreed inspection to the written record
What we provide in your industrial EICR inspection
An agreed inspection scope
The installation to be assessed, relevant access arrangements and any agreed limitations are established for your site.
A written condition report
Your EICR records the assessment, observations and test information so you can retain and review the findings.
Clear follow-up priorities
We explain the findings and discuss any necessary investigation or remedial work. Additional work is agreed separately.
Tell us about your site
Request your Northamptonshire industrial EICR quote
Send PAT Testing Northampton the site address, type of operation, approximate board and circuit count, and any required completion date. Include the last report and proposed shutdown windows where available.