PAT Testing Northampton
  • PAT Testing
    • Landlords & Rentals
    • Industrial Estates
    • Offices
    • Service Area >
      • Daventry
      • Wellingborough
      • East Northamptonshire
      • Kettering
      • Corby
      • South Northamptonshire
      • Weston Favell
      • Brackmills
      • Moulton Park
      • Round Spinney
  • EICR
    • Domestic EICR >
      • EICR Daventry
      • EICR Wellingborough
      • EICR Corby
    • Industrial EICR >
      • EICR Brackmills & Moulton
      • Wellingborough
  • Prices
  • FAQ
    • Terms & Conditions 2026
  • Contact Us
  1. PAT Testing Northampton
  2. Industrial EICR Northamptonshire

Factories · Warehouses · Workshops

Industrial EICR & Fixed Wire Testing in Northamptonshire

Arrange inspection and testing of your industrial premises’ fixed electrical installation with PAT Testing Northampton. An Electrical Installation Condition Report records the condition of the installation, the findings and the action needed within an agreed scope.

Tell us about the site, distribution boards and operational restrictions. We can then discuss the work, access and necessary power interruptions before quoting.

Request an industrial EICR quoteCall 01604 312137

For a home or rental property, visit our domestic EICR Northamptonshire page.

Fluke multifunction tester beside an industrial distribution board.
Fluke multifunction tester beside an industrial distribution board.
Define the installation
Boards, circuits, fixed supplies and any agreed limitations.
Plan the visit
Access, isolation windows and the people responsible for the site.
Record the findings
A written condition report and priorities for follow-up.
  • Your premises
  • What is tested
  • Shutdown planning
  • How often?
  • Your report
  • Cost
  • Coverage
  • Gallery
  • FAQs

A condition report for your working premises

Industrial electrical inspections shaped around the site

Industrial fixed wire testing assesses the permanent electrical installation supplying the building and its connected loads. It combines inspection with appropriate electrical tests. The resulting EICR helps site managers, occupiers and landlords understand the recorded condition and plan maintenance.

Factories and production sites

Identify production supplies, local isolation points and processes that need an agreed stop and restart.

Warehouses and logistics units

Plan access around storage, loading activity, distribution boards and lighting circuits.

Workshops and engineering units

Describe fixed supplies, three-phase equipment connections and any separate workshop buildings.

Industrial estates and managed units

Confirm the boundary between tenant installations, landlord supplies and shared areas.

One site can contain several installations. Include offices, welfare areas, stores, external circuits and separately supplied buildings in your enquiry. Their inclusion should be agreed in the inspection scope.

What is included in fixed wire testing?

Boards, circuits and protective measures

The agreed extent determines which parts of the installation are inspected and tested. Accessible equipment, circuit information and any restrictions are recorded, so the report is clear about what its assessment covers.

Distribution boards and switchgear

Assessment of accessible enclosures, protective devices, switching equipment and circuit identification. Observations may concern damage, deterioration or the suitability of the protection provided.

Distribution board enclosure labelled DB3.
Distribution board enclosure labelled DB3.

Fixed wiring, earthing and bonding

Inspection and appropriate tests of circuits and protective conductors, including relevant continuity, insulation resistance and polarity checks. Sensitive equipment must be considered when planning tests.

Circuit breakers, wiring and protective conductors in an open board.
Circuit breakers, wiring and protective conductors in an open board.

Fixed supplies and isolation points

Identify supplies to plant and local switching arrangements. Agree where the installation assessment ends and any separately required machine or equipment assessment begins.

Wall-mounted switches, fuse enclosure and control switch.
Wall-mounted switches, fuse enclosure and control switch.

Lighting, sockets and associated areas

Include the relevant power and lighting circuits serving the industrial premises and agreed ancillary areas. Appropriate RCD, loop impedance and functional checks support the assessment.

Board identification for office power, lighting and other circuits.
Board identification for office power, lighting and other circuits.

Three-phase electrical testing

Three-phase distribution can supply production equipment and multiple outgoing circuits. Tell us about the supply arrangement, board count and connected plant when requesting a quote. The testing scope must reflect the actual installation and the available records.

High-voltage systems, hazardous areas, specialist machinery and alternative energy supplies need to be identified before booking so we can establish the appropriate scope and competence requirements.

Close view of protective devices and conductors inside a board.
Close view of protective devices and conductors inside a board.

How an EICR differs from other electrical checks

WorkPurpose and boundary
Industrial EICRAssesses the agreed fixed electrical installation and records its condition, observations and test information.
PAT testingAssesses electrical appliances and equipment. See our industrial PAT testing service if you need both.
Machinery and work equipmentMachine internals, guarding and safety functions require their own appropriate assessment. Testing a supply circuit does not establish the safety of every machine function.
Other specialist checksThermal imaging, emergency lighting, fire alarms and remedial work are not automatically included in an EICR. Identify any separate requirements when enquiring.

Plan around the operation

Make power interruptions part of the plan

Some inspection and testing requires isolation. Agree the affected circuits, safe shutdown arrangements and authorised contacts before the visit. Tell us about critical loads and alternative supplies so these can be considered at the planning stage.

Discuss your site requirements

Before, during and after the appointment

Planning an industrial EICR visit

  1. Define the work

    Share the last report, board schedules and any changes since the previous inspection. Confirm the buildings, circuits, responsibilities and limitations that the quotation needs to cover.

  2. Agree access and isolation

    Identify the site contact, authorised shutdown arrangements, inductions and access restrictions. Discuss available maintenance windows and any request for work outside normal operating hours.

  3. Inspect, report and follow up

    The findings and test information form the written report. Review its assessment, prioritise any required action and keep subsequent completion records with the original EICR.

Information that makes the visit easier to organise

  • The person who can authorise isolation and coordinate plant restart.
  • Critical processes, IT, refrigeration, alarms and other sensitive loads.
  • Solar PV, batteries, generators, UPS systems or other sources of supply.
  • Restricted rooms, working-at-height needs and access to each board.
  • Required site inductions, permits and relevant operating procedures.

Phased work or particular appointment times must be agreed for the installation and the available access. Testing cannot be promised without power interruptions.

Manufacturing equipment and fixed lighting within a production building.
Manufacturing equipment and fixed lighting within a production building.

Inspection frequency and workplace duties

How often does an industrial installation need an EICR?

There is no single statutory five-year interval for every industrial site. The appropriate interval depends on the installation, its use, environmental conditions, maintenance and previous findings.

Start with the last report

Check the recommended next inspection date and the reasons given. Review any outstanding findings, additions or changes in use. Damage, unusual heating or other concerns may need attention before the planned inspection date.

Consider the wider requirements

Check relevant insurance and lease requirements alongside the site’s maintenance arrangements. Conditions such as dust, moisture, mechanical damage and intensive use can affect the inspection and maintenance plan.

The legal duty concerns preventing danger. The Electricity at Work Regulations 1989 place duties on employers and others with control of electrical systems. An EICR helps inform maintenance decisions; ongoing responsibilities extend beyond obtaining the report.

Understand the record and the next steps

Your industrial Electrical Installation Condition Report

Read the overall assessment alongside the extent, limitations, observations and test schedules. Together, these explain what was assessed and the findings that need attention.

What the report records

  • The installation covered and any recorded limitations.
  • The inspection observations and relevant test results.
  • The overall assessment and coded findings.
  • The recommended next inspection date and supporting reasons.

What happens after the inspection?

Discuss urgent issues and the necessary follow-up with the inspector. Any remedial work or further investigation needs a clear scope and agreement. Keep evidence of the completed work with the original report.

Agree the reporting timescale before booking. Our terms and conditions explain the report issue and payment arrangements.

C1
Danger present. Immediate action is needed to make the situation safe.
C2
Potentially dangerous. Urgent remedial action is required.
C3
Improvement recommended. This code alone does not make the overall result unsatisfactory.
FI
Further investigation. Check the report edition, the inspector’s explanation and the action advised.

C1 or C2 findings make the overall result unsatisfactory. On BS 7671:2018+A4:2026 reports, FI is advisory and does not alone make the result unsatisfactory. Earlier report formats treat FI differently. Follow the stated findings and urgency; do not apply a domestic rental deadline automatically to an industrial site.

Existing circuit details schedule attached inside a board door.
Existing circuit details schedule attached inside a board door.
Existing circuit details and test information on a board schedule.
Existing circuit details and test information on a board schedule.

A quotation based on the installation

How much does industrial fixed wire testing cost?

The price depends on the installation and the work needed to inspect and test it. Floor area alone does not describe the number of circuits, boards or access arrangements.

  • Number and type of distribution boards and circuits.
  • Installation size, complexity and available circuit records.
  • Access, isolation planning and agreed working hours.
  • Additional buildings, supplies and site requirements.
  • The agreed inspection extent and reporting requirements.

Send the postcode, a description of the operation and the last EICR if available. Photographs of closed boards and circuit schedules can help us understand the enquiry. Confirm the total price, VAT position and exclusions before booking.

Ask for a site-specific quote
Multiple rows of protective devices within an electrical cabinet.
Multiple rows of protective devices within an electrical cabinet.

Northamptonshire industrial premises

County-wide enquiries, with local site planning

We take industrial EICR enquiries across Northamptonshire. Send the full site address and postcode so we can discuss the installation, access and appointment availability.

  • Northampton
  • Brackmills
  • Moulton Park
  • Round Spinney
  • Daventry
  • Wellingborough
  • Kettering
  • Corby
  • Rushden
  • Towcester
  • Brackley
  • Raunds
  • Desborough
  • Rothwell
  • Oundle
  • Irthlingborough

Northampton and its industrial areas

Include the unit number and access arrangements for sites in Brackmills, Moulton Park and Round Spinney. Identify separately occupied units and shared supplies.

Daventry and western Northamptonshire

For a factory, workshop or warehouse, explain the number of buildings and boards and who controls each supply. Include the operating hours and proposed testing window.

North and east Northamptonshire

For sites around Kettering, Corby, Wellingborough and Rushden, provide each address in a multi-site enquiry and note any different access or production restrictions.

Need appliance testing alongside the fixed installation inspection? See industrial PAT testing, including Brackmills, Moulton Park and Daventry. For residential work, use our Northamptonshire domestic EICR hub or Daventry home and rental EICR page.

Industrial installations in detail

Fixed wire testing and industrial premises gallery

These photographs show the range of boards, circuit records, fixed supplies and working environments involved in planning an industrial inspection. Select a photograph to view it at full size.

Handwritten circuit schedule beside a main switch and meter.
Handwritten circuit schedule beside a main switch and meter.
Production area with marked access routes and pallet handling equipment.
Production area with marked access routes and pallet handling equipment.
Closed metal electrical distribution cabinet.
Closed metal electrical distribution cabinet.
Factory floor with production plant and overhead lighting.
Factory floor with production plant and overhead lighting.
Distribution board with circuit identification and a main switch.
Distribution board with circuit identification and a main switch.
Process machinery, local controls and extraction equipment.
Process machinery, local controls and extraction equipment.
View 29 more industrial photographs
Open distribution board showing conductors and protective devices.
Open distribution board showing conductors and protective devices.
Distribution board with outgoing circuits and protective conductors.
Distribution board with outgoing circuits and protective conductors.
Process machinery and its local control panels.
Process machinery and its local control panels.
Workshop area with equipment and materials awaiting use.
Workshop area with equipment and materials awaiting use.
Distribution board with marked three-phase circuit positions.
Distribution board with marked three-phase circuit positions.
Numbered circuit breakers and conductors inside a distribution board.
Numbered circuit breakers and conductors inside a distribution board.
DB3 circuit chart, main switch and supply identification.
DB3 circuit chart, main switch and supply identification.
Protective devices, internal wiring and main switching equipment.
Protective devices, internal wiring and main switching equipment.
Electrical cabinet with switching equipment mounted alongside.
Electrical cabinet with switching equipment mounted alongside.
Machine control panel beside the production equipment it serves.
Machine control panel beside the production equipment it serves.
Factory production equipment beneath fixed overhead lighting.
Factory production equipment beneath fixed overhead lighting.
Open distribution board with outgoing circuits and protective devices.
Open distribution board with outgoing circuits and protective devices.
Circuit details schedule fixed inside a distribution board door.
Circuit details schedule fixed inside a distribution board door.
Electrical enclosure with manufacturer and recorded supply information.
Electrical enclosure with manufacturer and recorded supply information.
Distribution board with labelled circuits and main switching equipment.
Distribution board with labelled circuits and main switching equipment.
Production machines arranged along a factory work area.
Production machines arranged along a factory work area.
Switchgear connections and cabling inside an electrical cabinet.
Switchgear connections and cabling inside an electrical cabinet.
Workshop storage racks holding tooling and components.
Workshop storage racks holding tooling and components.
Distribution board main switch, circuit breakers and internal wiring.
Distribution board main switch, circuit breakers and internal wiring.
Distribution board with a circuit chart for equipment supplies.
Distribution board with a circuit chart for equipment supplies.
Fixed cabling and an industrial socket beside a distribution board.
Fixed cabling and an industrial socket beside a distribution board.
Production line, access aisle and overhead lighting.
Production line, access aisle and overhead lighting.
Outgoing circuit wiring and protective devices inside a board.
Outgoing circuit wiring and protective devices inside a board.
Circuit labels for hot water, mechanical services and kitchen sockets.
Circuit labels for hot water, mechanical services and kitchen sockets.
Circuit identification chart for multiple equipment and building supplies.
Circuit identification chart for multiple equipment and building supplies.
Workshop production equipment and overhead service routes.
Workshop production equipment and overhead service routes.
Numbered circuit breakers with conductors arranged around the board.
Numbered circuit breakers with conductors arranged around the board.
Factory work area with process equipment and materials.
Factory work area with process equipment and materials.
Separate circuit schedules for mechanical services, power and lighting.
Separate circuit schedules for mechanical services, power and lighting.

Questions before you book

Industrial EICR questions answered

Fixed wire testing describes inspection and testing of the permanent electrical installation. The EICR is the written condition report produced from that work. People may call it an industrial EICR certificate, but the document records an assessment and findings within its stated scope.

There is no universal statutory five-year EICR period for all industrial premises. The appropriate interval depends on use, condition, maintenance, external influences and previous findings. Check the last report and any relevant lease or insurer requirements when arranging the next inspection.

Some work may be planned around areas that remain in use, but parts of the inspection and testing require isolation. Identify the affected circuits and agree a safe work plan with the site contact. Whether a phased approach is suitable depends on the installation and access.

Yes, include your preferred maintenance window or out-of-hours requirement in the enquiry. Availability, access, site staffing and any pricing implications need agreement before the appointment. Do not assume a particular slot is booked until it has been confirmed.

The agreed fixed installation scope may include circuits supplying machinery. That does not automatically assess all machine internals, guarding or safety functions. Identify separate machinery and work-equipment inspection requirements when discussing the site.

Tell us which records are unavailable and send photographs of closed boards where possible. Missing or inaccurate circuit information can affect identification, planning and the time needed. The quotation should address the intended scope and any additional work required.

Duration depends on circuit and board count, installation complexity, access, records and agreed isolation windows. Send the previous report and site details so the work can be assessed. Confirm both the site attendance plan and report issue arrangements before booking.

Remedial work and extra investigation are agreed separately unless expressly included in the quotation. Ask for the inspection extent, total price, VAT position and exclusions in writing. Required follow-up should reflect the findings and urgency recorded by the inspector.

Ask the insurer or landlord what document, scope and reporting period they require, then share that requirement when enquiring. An EICR provides evidence about the assessed installation, but acceptance and other conditions depend on the particular policy or lease.

The two services address different parts of electrical safety. An EICR assesses the fixed installation; PAT concerns electrical equipment. A satisfactory EICR does not remove the need to assess and maintain appliances appropriately. See our industrial PAT testing page for that service.

From the agreed inspection to the written record

What we provide in your industrial EICR inspection

An agreed inspection scope

The installation to be assessed, relevant access arrangements and any agreed limitations are established for your site.

A written condition report

Your EICR records the assessment, observations and test information so you can retain and review the findings.

Clear follow-up priorities

We explain the findings and discuss any necessary investigation or remedial work. Additional work is agreed separately.

Tell us about your site

Request your Northamptonshire industrial EICR quote

Send PAT Testing Northampton the site address, type of operation, approximate board and circuit count, and any required completion date. Include the last report and proposed shutdown windows where available.

Send an industrial EICR enquiryCall 01604 312137

Technical guidance checked 5 October 2026. Further reading: HSE guidance on the Electricity at Work Regulations, IET inspection and testing FAQs, HSE safe working practices, HSE work equipment inspections and IET guidance on further investigation.

Industrial installation photograph

PAT Testing Daventry Google Reviews
PAT Testing Daventry Facebook Reviews
PAT Testing Daventry Trustpilot Reviews
PAT Testing Daventry Yell Reviews

Contact Us »
PAT Testing Northampton

📞 01604 312137
​

PRICES »​
CONTACT »
​Landlords »
Office »
​Industrial Estates »

Opening Hours

Mon: 8:00 am –  6:00 pm
  Tue: 8:00 am –  6:00 pm
Wed: 8:00 am –  6:00 pm
Thu: 8:00 am  –  6:00 pm
  Fri: 8:00 am  –  6:00 pm
 Sat: 8:00 am  –  6:00 pm
Sun: 8:00 am  –  6:00 pm
​
📞 ​01604 312137
​

PAT Testing in Northampton 2026
PAT Testing Northampton 2026

Service Area
PAT Testing Milton Keynes​
​​Corby | ​Daventry | ​Brackmills | Round Spinney | Moulton Park | Kettering | ​​Weston Favell​​ | Wellingborough | ​South Northamptonshire | ​East Northamptonshire​
​
Terms & Conditions 2026
© COPYRIGHT 2026 (ALL RIGHTS RESERVED)
​

  • PAT Testing
    • Landlords & Rentals
    • Industrial Estates
    • Offices
    • Service Area >
      • Daventry
      • Wellingborough
      • East Northamptonshire
      • Kettering
      • Corby
      • South Northamptonshire
      • Weston Favell
      • Brackmills
      • Moulton Park
      • Round Spinney
  • EICR
    • Domestic EICR >
      • EICR Daventry
      • EICR Wellingborough
      • EICR Corby
    • Industrial EICR >
      • EICR Brackmills & Moulton
      • Wellingborough
  • Prices
  • FAQ
    • Terms & Conditions 2026
  • Contact Us