PAT Testing Northampton
  • PAT Testing
    • Landlords & Rentals
    • Industrial Estates
    • Offices
    • Service Area >
      • Daventry
      • Wellingborough
      • East Northamptonshire
      • Kettering
      • Corby
      • South Northamptonshire
      • Weston Favell
      • Brackmills
      • Moulton Park
      • Round Spinney
  • EICR
    • Domestic EICR >
      • EICR Daventry
      • EICR Wellingborough
      • EICR Corby
    • Industrial EICR >
      • EICR Brackmills & Moulton
      • Wellingborough
  • Prices
  • FAQ
    • Terms & Conditions 2026
  • Contact Us
  1. PAT Testing Northampton
  2. Industrial EICR Northamptonshire
  3. Brackmills & Moulton Park

Northampton industrial estates

Industrial EICR in Brackmills and Moulton Park

Arrange fixed wire testing for your factory, warehouse or workshop with PAT Testing Northampton. An Electrical Installation Condition Report records the condition of the agreed electrical installation and the findings that need attention.

Tell us which unit you occupy, the areas you need assessed and when power can be interrupted. We can then discuss the inspection scope, access and shutdown arrangements before preparing your quotation.

Request an industrial EICR quoteCall 01604 312137

For premises on either estate, or a coordinated enquiry covering both locations.

Distribution board main switch, circuit breakers and internal wiring.
Distribution board main switch, circuit breakers and internal wiring.
Your unit and circuits
Agree the installation and areas to be included.
Planned power interruptions
Identify affected equipment and suitable access windows.
A written condition report
Recorded findings, limitations and recommended next steps.
  • Estate coverage
  • Inspection scope
  • Planning the visit
  • Unit moves & changes
  • Costs
  • Photographs
  • FAQs

Local coverage, an agreed scope

Fixed wire testing industrial locations

The estate name helps locate the site. The unit layout, electrical records and operating arrangements determine how the inspection should be planned.

  • Brackmills Industrial Estate
  • Moulton Park Industrial Estate
  • Northampton

Industrial EICR in Brackmills

Brackmills brings together logistics, manufacturing and service premises. For a warehouse or production unit, the useful starting point is how the electrical installation serves the business throughout the working day.

Include the unit number and entrance to use, goods-in restrictions, shift times and the person who can authorise interruptions. Where dispatch, refrigeration or production must be protected from an unplanned outage, identify those circuits before a visit is agreed.

Need appliance checks as well? See PAT testing in Brackmills.

Industrial EICR in Moulton Park

Enquiries can cover premises around Tenter Road, Summerhouse Road, Redhouse Road, Kings Park Road and Deer Park Road. Send the full address and postcode so the correct unit and access point are identified.

If offices, workshop space or shared areas are supplied from different boards, explain which parts of the premises you control and want included. Existing schedules and a previous report help establish the intended boundary of the inspection.

For separate equipment checks, see PAT testing in Moulton Park.

One enquiry for more than one unit

If you manage premises on both estates, list each address separately with its boards, records, site contact and preferred dates. A single enquiry can start the discussion, while the scope, access and reporting requirements still need to be clear for every installation.

For other locations, visit our industrial EICR and fixed wire testing Northamptonshire hub.

Production machines arranged along a factory work area.
Production machines arranged along a factory work area.

What the inspection covers

Define the fixed installation before testing starts

An industrial EICR assesses the installation within its agreed extent and recorded limitations. Relevant areas may include production space, storage, offices and welfare facilities.

Distribution boards and circuit records

Establish the boards, protective devices and circuits to be assessed. Board identification and existing schedules help relate test results to the areas and equipment they serve.

DB3 circuit chart, main switch and supply identification.
DB3 circuit chart, main switch and supply identification.

Fixed wiring, earthing and bonding

Inspection and appropriate testing assess the relevant wiring and protective measures. The condition, accessibility and arrangement of the installation inform the work and any limitations recorded.

Switchgear connections and cabling inside an electrical cabinet.
Switchgear connections and cabling inside an electrical cabinet.

Fixed supplies and local isolation

Identify circuits feeding plant and the associated isolation points. Agree where the installation assessment ends and any separately required machinery inspection begins.

Fixed cabling and an industrial socket beside a distribution board.
Fixed cabling and an industrial socket beside a distribution board.

Lighting, sockets and ancillary areas

Include the relevant power and lighting circuits, with appropriate protective-device and functional checks. Make clear whether office areas, mezzanines, external supplies and shared spaces form part of the scope.

Circuit labels for hot water, mechanical services and kitchen sockets.
Circuit labels for hot water, mechanical services and kitchen sockets.

Three-phase supplies and machinery

Tell us about three-phase distribution, generators, solar generation, UPS systems or other alternative supplies before booking. An assessment of a machine's supply circuit does not establish the condition of every internal component, control or safety function. Share any specialist equipment or hazardous-area requirements when enquiring.

Plan around the installation

Agree the interruption before the inspection

Parts of fixed wire testing require safe isolation. Identify critical loads, agree who can authorise shutdowns and allow for the site's own restart procedures. Whether testing can be phased depends on the installation and access.

Discuss your inspection window

A practical booking checklist

What to prepare for a Brackmills or Moulton Park visit

  1. Send the site information

    Provide the address, unit number, previous EICR and available board schedules. Photographs of closed boards and labels can help explain the layout without removing covers.

  2. Identify operating constraints

    List equipment that needs a controlled shutdown, areas with restricted access and any induction or permit arrangements. Include preferred maintenance windows and the relevant site contacts.

  3. Confirm the work plan

    Agree the inspection extent, access, expected attendance, isolation arrangements and report issue requirements. Confirm any out-of-hours attendance and pricing before booking.

Details to discuss where these areas or systems are present
Area or systemWhat to agree before the visit
Warehouse and dispatchAccess around loading activity, storage routes and equipment that affects goods movement.
Production equipmentAffected supply circuits, the shutdown window and who is responsible for machine shutdown and restart.
IT, security or refrigerationCritical loads, alternative supplies and the consequences of interruptions, including any required specialist attendance.
Shared or landlord-controlled areasThe inspection boundary, access permission and the person authorised to agree work on shared supplies.

A plan should reflect the actual installation. Do not assume that a board supplies only the room or tenant nearest to it.

Moving in, expanding or dividing space

Does the previous report cover the unit as it is now?

A report for the building may have a different scope from the space your business occupies today. Compare its description and limitations with the current layout and any subsequent electrical work.

Taking over a unit

Obtain the previous EICR and available installation records. Share any lease or insurer requirements, your intended use and the areas you need assessed. Agree the reporting requirement before relying on an inherited document.

Dividing or extending premises

Explain new partitions, mezzanines, added circuits or shared services. The inspector needs to understand the current arrangement and whether board schedules still describe it accurately.

Changing production or equipment

Identify new loads and provide records for electrical alterations where available. An EICR assesses condition; it does not replace the design, installation or verification work required for an alteration.

Keep the report connected to the premises

Use consistent unit and board names in your enquiry. If a report describes a larger building or a previous tenant's layout, flag the difference rather than assuming every present-day circuit is included.

This is especially useful when facilities, landlords and occupiers hold different sets of records.

Circuit details schedule fixed inside a distribution board door.
Circuit details schedule fixed inside a distribution board door.

Pricing the actual inspection

How much does an industrial EICR cost?

The quotation depends on the installation and the work needed to assess it. Floor area gives context, but it cannot describe the number of circuits, condition of records or access constraints by itself.

  • Number and type of boards and circuits.
  • Installation complexity and available records.
  • Access to equipment and agreed isolation windows.
  • Any phasing, out-of-hours attendance or extra identification work.

Send the last report if you have it. Ask for the inspection scope, price, VAT position and exclusions in writing. Repairs or additional investigation are separate unless expressly included.

Send your site details for a quote
Factory production equipment beneath fixed overhead lighting.
Factory production equipment beneath fixed overhead lighting.

After inspection and testing

Use the findings to plan the next action

Review the assessment and its scope

Read the overall assessment alongside the observations, schedules and recorded limitations. Immediate danger needs immediate action; potentially dangerous defects need urgent remedial action. Agree any further investigation or repairs with reference to the inspector's findings and urgency.

For a fuller explanation of the report and observation codes, see our industrial EICR report guidance.

Check when the next inspection is due

There is no universal statutory five-year industrial EICR interval. The competent inspector considers the installation, use, environment and maintenance when recommending the next inspection.

Check the previous report and relevant lease or insurer conditions. Significant changes or concerns about the installation may need attention before a routine date comes round.

Handwritten circuit schedule beside a main switch and meter.
Handwritten circuit schedule beside a main switch and meter.
Circuit identification chart for multiple equipment and building supplies.
Circuit identification chart for multiple equipment and building supplies.

Industrial installation photographs

Boards, records and working environments

These photographs illustrate industrial electrical installations, equipment supplies and the records used when planning inspection work. Select an image to view the full photograph.

Production area with marked access routes and pallet handling equipment.
Production area with marked access routes and pallet handling equipment.
Distribution board with circuit identification and a main switch.
Distribution board with circuit identification and a main switch.
Process machinery, local controls and extraction equipment.
Process machinery, local controls and extraction equipment.
Distribution board with outgoing circuits and protective conductors.
Distribution board with outgoing circuits and protective conductors.
Numbered circuit breakers and conductors inside a distribution board.
Numbered circuit breakers and conductors inside a distribution board.
Protective devices, internal wiring and main switching equipment.
Protective devices, internal wiring and main switching equipment.
View 6 more installation photographs
Machine control panel beside the production equipment it serves.
Machine control panel beside the production equipment it serves.
Open distribution board with outgoing circuits and protective devices.
Open distribution board with outgoing circuits and protective devices.
Electrical enclosure with manufacturer and recorded supply information.
Electrical enclosure with manufacturer and recorded supply information.
Workshop storage racks holding tooling and components.
Workshop storage racks holding tooling and components.
Distribution board with a circuit chart for equipment supplies.
Distribution board with a circuit chart for equipment supplies.
Workshop production equipment and overhead service routes.
Workshop production equipment and overhead service routes.

Questions about your premises

Brackmills and Moulton Park EICR FAQs

Fixed wire testing is a common name for inspection and testing of the permanent electrical installation. The EICR is the written condition report from that assessment. If a landlord or insurer asks for an electrical certificate, share the wording of the request so the required document and scope can be established.

Include the preferred window in your enquiry, along with access, staffing and shutdown arrangements. Availability and any additional cost need to be confirmed. An out-of-hours request does not itself reserve an appointment.

A phased approach may be possible where the installation and access allow it. Send the board schedules and explain which areas can be interrupted at each stage. The plan must account for shared circuits and alternative supplies rather than assuming each department can be isolated independently.

Explain the arrangement before booking and identify the landlord, facilities contact or other person who controls access. Agree which circuits and areas are included and who can authorise interruptions. The scope and limitations should make the boundary of the assessment clear.

Start by checking the previous report's date, installation description, extent, limitations and findings. Share any changes to the layout, circuits or use, and any lease or insurer requirements. Whether further inspection is needed depends on those details; a change of occupier alone does not answer the question.

Yes. Send the address, premises type, previous report if available and photographs of closed boards or labels. Missing records can affect the time needed for identification and the quotation. Do not remove electrical covers to obtain photographs.

The agreed installation scope may cover three-phase distribution and circuits supplying machines. It does not automatically assess every part of the machinery, its controls or its safety functions. Explain your equipment and any separate inspection requirements when discussing the scope.

Yes. List each unit separately with its site contact, available electrical records and preferred dates. The inspection scope, access arrangements and reporting requirements need agreement for each installation, even if the visits are being planned together.

Attendance depends on circuit and board count, complexity, records, access and the available isolation windows. Confirm the attendance plan and report issue arrangements with the quotation. Repairs and extra investigation are separate unless expressly included.

An EICR assesses the agreed fixed installation. PAT concerns electrical appliances and equipment. A satisfactory EICR does not replace an appropriate equipment-maintenance programme. See industrial PAT testing for the separate service.

Clear scope, useful documentation

What you receive with your industrial EICR

A written condition report

An assessment of the agreed installation, with the relevant inspection and test schedules and any recorded limitations.

Recorded observations

Findings and recommendations that help you understand which issues require action and how urgently.

A basis for follow-up work

Information to discuss investigation, remedial work and ongoing maintenance. Any additional work needs an agreed scope.

Arrange your inspection

Get your Brackmills or Moulton Park industrial EICR quote

Send your full unit address and postcode, the type of premises, available board or circuit details and preferred dates. Include the previous report, any deadline and the power interruptions your site can accommodate.

Send an industrial EICR enquiryCall 01604 312137

Looking for a home or rental-property inspection? Visit our domestic EICR Northamptonshire page. For equipment, see industrial PAT testing.

Further reading: HSE guidance on the Electricity at Work Regulations and IET inspection and testing FAQs.

Industrial installation photograph

PAT Testing Daventry Google Reviews
PAT Testing Daventry Facebook Reviews
PAT Testing Daventry Trustpilot Reviews
PAT Testing Daventry Yell Reviews

Contact Us »
PAT Testing Northampton

📞 01604 312137
​

PRICES »​
CONTACT »
​Landlords »
Office »
​Industrial Estates »

Opening Hours

Mon: 8:00 am –  6:00 pm
  Tue: 8:00 am –  6:00 pm
Wed: 8:00 am –  6:00 pm
Thu: 8:00 am  –  6:00 pm
  Fri: 8:00 am  –  6:00 pm
 Sat: 8:00 am  –  6:00 pm
Sun: 8:00 am  –  6:00 pm
​
📞 ​01604 312137
​

PAT Testing in Northampton 2026
PAT Testing Northampton 2026

Service Area
PAT Testing Milton Keynes​
​​Corby | ​Daventry | ​Brackmills | Round Spinney | Moulton Park | Kettering | ​​Weston Favell​​ | Wellingborough | ​South Northamptonshire | ​East Northamptonshire​
​
Terms & Conditions 2026
© COPYRIGHT 2026 (ALL RIGHTS RESERVED)
​

  • PAT Testing
    • Landlords & Rentals
    • Industrial Estates
    • Offices
    • Service Area >
      • Daventry
      • Wellingborough
      • East Northamptonshire
      • Kettering
      • Corby
      • South Northamptonshire
      • Weston Favell
      • Brackmills
      • Moulton Park
      • Round Spinney
  • EICR
    • Domestic EICR >
      • EICR Daventry
      • EICR Wellingborough
      • EICR Corby
    • Industrial EICR >
      • EICR Brackmills & Moulton
      • Wellingborough
  • Prices
  • FAQ
    • Terms & Conditions 2026
  • Contact Us